MMG CNC Supplier Quality Terms & Conditions

MMG CNC Supplier Quality Terms & Conditions

F-840-005-A 

Product/Service Purchased

Applicable PO Clause Codes

Raw Materials including Chemicals 

C01, C02, C04, C05, C06, C07, C13, C15, C16, C17, C18, C19, C20, C21, C22, C23, C24, C25

Hardware & Other Materials

C01, C02, C04, C05, C06, C07, C09, C13, C15, C16, C17, C18, C19, C21, C22, C23, C24, C25

Special Processes

(e.g. Heat Treat, Plating, Welding)

C01, C02, C03, C05, C06, C07, C10, C11, C13, C15, C17, C18, C19, C21, C22, C24, C25

Other Outside Services

C01, C02, C05, C06, C07, C08, C09, C10, C12, C13, C15, , C17, C18, C19, C21, C22, C24, C25

Calibration

C02, C06, C14, C19, C21

 

Clause Number

Title

Requirement

C01

Quality System

Supplier shall establish and maintain a Quality System acceptable to MMG CNC, for the goods and/or services purchased under this purchase order. As a minimum, the supplier's Quality System must meet the requirements of ISO9001 or better.

C02

Environmental Compliance

The Supplier/Contractor is required to comply with al statutory, regulatory and other environmental legal requirements.  If environmental operating permits are required, Supplier/Contractor must provide either a copy of ISO 14001 registration certificate or a copy of applicable permits. Supplier/Contractor must notify MMG CNC of any environmental violations, incidents, or loss of permits.  Supplier/Contractor must be insured.

C03

NADCAP Approval

Special processing NADCAP approval is required. The special process requirements will be listed on the actual purchase order.

C04

Supplier Furnished Material

Supplier shall submit Chemical and Physical test reports in accordance with the latest material specifications and revision. Distributors must provide a certification verifying the materials traceability to the Mill test reports when supplied.

C05 

Sub-Contractor Flow Down

Supplier is required to flow down the requirements of this purchase order, including terms and conditions to the Supplier's subcontractors. Flow down of key characteristics is required when specified on the face of purchase order. 

C06

Record Retention and Disposition

As a minimum, the Supplier is to retain records for at least 10 years from the date of shipment under each applicable order for all products/part numbers unless otherwise specified in the order.  In special circumstances, the purchase order will identify the actual required number of years that the records should be maintained. After the minimum retention period is achieved, suppliers may disposition the records as archive or destroy at their discretion.

C07

Measuring & 

Test Equipment

The Supplier's equipment shall be calibrated in accordance with ANSI/NCLSL Z540-1 or ISO 10012-1 and traceable to NIST.

C08

MMG CNC Furnished Property

Supplier is to return all furnished property to MMG CNC at the completion of the purchase order. Furnished property may include but not be limited to the following: drawings, mylars, process specification, tooling, fixtures, and excess raw material.

C09

Parts Identification

The Supplier is to identify parts in accordance with purchase order requirements.

C10

Nonconforming Product/Corrective Action

The Supplier is to notify MMG CNC of any Nonconforming product prior to shipping product and obtain approval for disposition of any nonconforming product. In addition, the Supplier will maintain a system of handling non-conformances and corrective actions.

C11

Special Processing Approval

The Supplier is to perform a special process on this purchase order. Special processing may include one of the following processes: heat-treating, stress relieving or Nondestructive testing. MMG CNC shall identify the specific process specification and the end user on the purchase order. The Supplier should maintain its special process approval with the end user. If the Supplier is not currently approved for the specified process, it is the Supplier's responsibility to notify MMG CNC immediately.

C12

Dimensional Inspection Report

The Supplier is to document an actual dimensional inspection report and submit it to MMG CNC at the completion of the purchase order.

C13

Shelf Life Materials 

The supplier provides the manufacturing date, shelf life, and expiration date for all limited shelf life items under this order. All items will have 75% or more of their shelf life remaining at the time of shipment to MMG CNC. All items are packaged, labeled and transported per their applicable regulatory requirements.


C14

Calibration Vendor

The calibration vendor shall be accredited to ISO17025. All measuring and test equipment shall be calibrated in accordance with ANSI/NCLSL Z540.3 and traceable to NIST.

C15

Packaging Protection

Supplier to package parts in a manner that will protect parts from any kind of damage. No metal to metal contact is ever allowed. In special circumstances, the purchase order may specify the manner the parts are to be packaged.

C16

Material Safety Data Sheets

All materials must supplied on this order must be accompanied by the applicable Safety Data Sheet

C17

Certificate of Conformance

A certification is required, stating that all of the products or services meet the contractual or purchase order requirements. The certificate must list the part number and all of the applicable process specifications, including up to date revision levels.

C18

Verification on Supplier’s Premises

Verification of product on supplier premises by MMG CNC or its customers, does not remove the obligation to provide conforming products and shall not be used as the organizations evidence of conformity.

C19

Acceptance Authority Media

Media such as inspection stamps and electronic signatures used for product acceptance/inspection must be controlled and traceable to the personnel they are issued to.

C20

BUY AMERICA ACT

Items procured under this purchase order must be compliant with DFAR 252.225-7000


C21

Right of Entry

MMG CNC, our customers, and/or any applicable regulatory authority reserve the right to access the supplier’s applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records. Reason for access may include inspection of the item on order, status of the item, or reviewing quality records pertaining to the purchase order in question.

C22

Quality & Environmental Awareness

Vendors Personnel must be made aware of:

• their contribution to product or service conformity;

• the importance of ethical behavior.

• the importance of complying with applicable environmental laws & regulatory requirements.

C23

Counterfeit Prevention

Vendor must have a process in place to detect and prevent the use of counterfeit parts/materials. The holder of the MMG CNC Purchase Order must be the Original Equipment (Component) Manufacturer (OEM) of the product or the OEM’s Authorized Distributor with traceability to the OEM. Authorized distributors shall provide certification to OEM approved distribution. Or provide evidence of certification, or approval from the appropriate OEM of the product supplied to MMG CNC.

C24

Control & Monitoring Requirements

Vendor must maintain a Quality Level ≥98% and an OTD level ≥98%. If levels drop below target, supplier will be notified and may be placed on conditional status or disapproved if not corrected

C25

Change Notification

Supplier is to notify MMG CNC of changes in product and/or process, changes of suppliers, changes of manufacturing facility location and, where required, obtain organization approval.

C26

ITAR

ITAR REQUIREMENTS: The Code of Federal Regulations 22 CFR International Traffic in Arms Parts 120 thru 130 apply to all items on this order that meet the requirements of 22 CFR 120.  When the MMG CNC Contract or Purchase Order defines that the product being purchased is for a military program or is being developed for a military program the supplier shall ensure they are in full compliance with ITAR requirements.